Product Details
+
Features
-
M18 FUEL 18V 1/4-Inch Surge Hex Hydraulic Driver
- With Milwaukee's new FLUID-DRIVE Hydraulic Powertrain, users will experience up to 50% quieter operation, 3X less vibration for smoother operation, and faster driving speeds compared to standard impacts.
- The POWERSTATE Brushless Motor delivers up to 0-3,000 RPM with constant power output to drive screws faster.
- REDLINK PLUS Intelligence is the most advanced electronic system on the market, preventing damage to the tool and battery caused by overloading or overheating.
- For use with REDLITHIUM Compact Batteries or Extended Capacity Batteries (sold separately), which deliver more work per charge and more work over the life of the pack than competitive batteries on the market.
- The 4-Mode DRIVE CONTROL provides greater control over output speed and power for greater versatility.
- Self-Tapping Screw Mode is designed to reduce walking when starting self-tapping screws as well as reduce overdriving, breaking and stripping out screws.
- Milwaukee POWERSTATE Brushless Motor provides more power, more run-time, and longer life.
- REDLINK PLUS Electronic Intelligence enables advanced communication between your batteries and tools, allowing for unmatched levels of performance, protection, and productivity. M18 18V 5.0Ah REDLITHIUM XC System Starter Kit
- REDLINK Intelligence: Provides optimized performance and overload protection using total system communication between tool, battery and charger
- Best-in-class construction: Offers long-lasting performance and durability
- Fuel gauge onboard: Displays remaining runtime for less downtime on the job
- All-weather performance: Delivers fade free power in extreme jobsite conditions
- Add any M18 Tool-Only Option to Build Your Own Kit M18 18V 5.0Ah REDLITHIUM XC System Starter Kit
- REDLINK Intelligence: Provides optimized performance and overload protection using total system communication between tool, battery and charger
- Best-in-class construction: Offers long-lasting performance and durability
- Fuel gauge onboard: Displays remaining runtime for less downtime on the job
- All-weather performance: Delivers fade free power in extreme jobsite conditions
- Add any M18 Tool-Only Option to Build Your Own Kit
REDLINK PLUS™
INTELLIGENCE
- Best in class thermal and overload monitoring to protect the tool
- Optimized tool performance with advanced electronic communication
- DRIVE CONTROL™ and on-board fuel gauge enhance productivity
What's in The Box
- 18-Volt 1/4-Inch M18 FUEL Surge Hex Hydraulic Driver - Bare Tool
- Belt Clip
- Bit Holder
- M18 REDLITHIUM XC5.0 Extended Capacity Battery Pack (48-11-1850)
- M18/M12 Multi-Voltage Charger (48-59-1812)
- Owner's Manual
Warranty
- 5 Years Limited Factory Warranty
- 30 Day Satisfaction Guaranteed
POWERSTATE™
BRUSHLESS MOTOR
- Uniquely engineered for the demands of each tool
- Perfectly optimized for a balance of performance, portability, and productivity
- top-grade rare earth materials
Specifications
| SKU | 2760-20SK5 |
| Brand | Milwaukee |
| 2760-20 | |
| Voltage | 18V |
| Drive Size | 1/4 in. |
| Drive Type | Hex |
| No Load Speed | 0 - 3,000 Rpm |
| Drive control | 4-Mode |
| LED Light | Yes |
| Length | 5 in. |
| Width | 2.38 in. |
| Height | 7.67 in. |
| Product Weight | 2.3 lbs. |
| Shipping Weight | 3 lbs. |
| 48-59-1850 | |
| Volts | 18V/12V |
| Charge Time | 1 Hour |
| Weight | 4 lbs |
REDLITHIUM™ Battery Pack
- A leader in the industry with lithium-ion battery technology
- The patented design protects against drops, water, and harsh conditions
- Robust electronics optimize the performance of every tool and battery combination








